PARADISE CAY, Marin County — October 31, 2026. Understanding the cost of keeping Paradise Cay's canals navigable starts with the county's 2024 maintenance-dredging contract. Marin County's Public Works Department awarded work to LIND Marine LLC, with a total authorized amount of $998,000 including contingency.
What was in the award?
A county project record and July 30, 2024 report of award show that the contract covered selected channel areas, including entrance and internal waterways. The director awarded a $911,416 base-plus-alternates contract and an $86,584 contingency. One optional alternate was not awarded because of funding limits.
Why is dredging recurring?
Sediment enters marina waterways through tides and local runoff, gradually reducing depth. Earlier county capital planning anticipated periodic work approximately every four to five years, although exact need depends on conditions. Dredging requires surveying, environmental review, permits and suitable sediment handling.
Does the historic award show today's depth?
No. A 2024 contract documents a procurement decision, not a hydrographic survey of every canal on October 31, 2026. Boaters should consult current charts, local notices and actual tides. The historic contract also should not be presented as the amount already spent under a proposed 2027 tax.
Sources: Marin County Public Works CSA 29 2024 maintenance-dredging procurement and award documents.
Support Paradise Cay News
Choose how to support Paradise Cay News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Paradise Cay News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Paradise Cay News
- Paradise Cay Measure Z: Early Returns Show 84 Yes Votes on Dredging Parcel Tax →
- Who Oversees Paradise Cay Waterways? CSA 29 Advisory Board Lists Six Members →
- Paradise Cay's Low-Lying Waterfront Faces Long-Term Flooding Risks, County Assessment Says →
- Paradise Cay Measure Z Would Set $2,200 Annual Dredging Parcel Tax Starting in July 2027 →
- Paradise Cay Maintenance Dredging Appears in March 2026 Environmental Filing →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.